Hotel
bathrooms. Transformed.
New design. Existing infrastructure.
One partner. Every detail.
One partner. Every detail.
Explore the systemThe RenewX difference
A new hotel bathroom. Built on the existing.
New finishes, fittings, glass and lighting. The layout and service points stay in place. Design, supply and installation by one accountable team.
Less downtime.
Installing over existing finishes shortens time on site and returns rooms to service sooner.
Less disruption.
Less demolition means less dust and noise, with installation phased around hotel operations.
Lower site costs.
Retaining the layout and service points reduces demolition, waste removal and rebuilding.
One partner.
Design, sourcing, installation and handover coordinated by one accountable team.
The method behind the benefits
New finishes.
Over the existing.
Retain the existing wall.
Sound existing walls and tiles stay in place.
Prepare & bond.
Prepare the surface for the specified bonding system.
Install the new finish.
Apply the cladding and resolve joints, corners and edges.
Suitability and scope confirmed through a site survey.
The process
From design.
To delivery.
One partner. Every stage.
01 / Design
One system.
Many identities.
A selection of wall and floor finishes.
Material, proportion and detail — considered together.
Select finishes to build your project palette.
Understand the room.
Survey the existing layout, surfaces and services. Define what stays and where the room can change.
Resolve the detail.
Consider panel sizes, tile joints, corners and fittings as one architectural composition.
Confirm the palette.
Review samples and suitability for each location before specifying the complete finish system.
02 / Source
From selection.
To a complete
package.
Confirm finishes, fittings, quantities and deliveries before installation.
01Specify
Confirm finishes and fittings. Coordinate preparation, bonding products and any required waterproofing with the surveyed conditions.
02Coordinate
Bring material quantities, trims, fittings and schedules together as one coordinated room package.
03Deliver to site
Sequence room packages around the agreed release of rooms, access and the hotel’s operations.

Select finishes in Design to begin your palette.
Refine your selection03 / Deliver
The detail,
carried through.
Prepare. Install. Inspect. Handover.
New finishes.
Existing infrastructure retained.
Concept detail. Final build-up follows the site survey and material specification.
Retain & prepare.
Check the existing surface and services. Prepare a suitable base for the new finish.
Bond & install.
Apply the specified preparation and bonding system. Resolve junctions, joints and edges.
Inspect & hand over.
Complete the finishes, check the work and return rooms in the agreed sequence.
One partner / Every stage
One company.
Architecture
to handover.
Architecture & interior design
Procurement & logistics
Construction & supervision
Discuss your project.
Tell us about your property. Review your details, then send your enquiry to our team.
Or email office@renew-x.com